When is a Material BOM Not Exploded?
When is a Material BOM Not Exploded?
A BOM is not exploded in the following situations:
A D V E R T I S E M E N T
- No BOM is effective:
-- On the explosion date and in the given area of validity
For the given effectivity parameters
- The BOM has a deletion indicator.
- The BOM is a multiple BOM, and has no alternative that
matches the lot size for your required quantity.
- No BOM matches the selection criteria of the BOM
application you selected.
- This is possible in the following situations, for example:
-- The application does not take all BOM usages into account.
For example, the application only takes BOMs that are relevant to production
into account, so a BOM that is relevant to sales and distribution is not
exploded.
-- The application selects a specific alternative on the
explosion date you require. The material master record supports alternative
determination by Explosion date.
If the specified alternative is not valid on the explosion date, the BOM is not
exploded.
-- The application takes production versions in the material
master record into account, but no production version has a BOM that is valid on
the explosion date you require. The material master record supports alternative
determination by Production version.
The system only explodes the BOM defined for the production version that matches
the alternative and/or usage entered on the explosion date required.
-- The application only takes BOMs with certain status
indicators into account.
For example, the application for MRP only explodes BOMs that have at least the
status Explosion for MRP.
Further checks:
- Do the proper Scheduling in Routing (Backward/forward). In md61 give the
requirement in next month.check your in-house production, planned delivery time
in md02 give MRP Control parameter Rexplode BOM and Routing.
- Check BOM explosion data in MRP4 view of material master
view ( Individual/Coll data).
|