PP - Controlling data for your Bill of
MaterialsYou define the
default values for BOM in OS28. - Based
quantity - BOM Status - Size Unit - Var-size item unit You control the Material
type allowed for the BOM header in transaction OS24.
In transaction OS27, you define the central
settings for your BOM management system. This are one-time settings for BOM
management, which should not be change after production.
Low date When you create or process BOMs, the
default date is the date defined in your system as the earliest processing date
(01/01/1900 in the standard system). BOM validity
maintenance Tick if want the user to specify a valid-from date when
maintaining BOMs. If not tick the BOM created as of the current date or the
system low date (1/1/1990). EC management active
Tick if you want to make historical changes to BOMs with reference to a
change number. (This means that the status of the BOM both before and after the
change is stored in the system.) In this step, you only specify whether
engineering change management can be used for maintaining bills of material. In
transaction OS25, Configure history requirement for BOMs, you define whether
you want to make the use of engineering change management a requirement in
certain cases. Hist. reqmt variant Use this
indicator to control when history requirement applies to new variants or
alternatives in a BOM group. Sub-item documentn
You use the Sub-item documentation indicator to define whether
changes to sub-items are documented. Header
Create BOM header with parameter validity TECHINCAL
TYPE Mult. BOM inactive Tick if no multiple BOMs can be maintained in
this R/3 system. Variant BOM inactive Tick
if no variant BOMs can be maintained in this R/3 system
BILL OF MATERIAL ITEM BOM item explosion type
If you create a BOM item with reference to a change number and change the
valid-from date (in the change header or alternative date), then this can
change the sequence of validity periods of a BOM item. The indicator BOM item
explosion type specifies whether and according to what rules, the system
determines a unique change status, when you display, evaluate or change a BOM
to a date in the overlap period. Description
variable-sized item This indicator controls which text is displayed
in BOM processing for a variable-sized item. Repeated
effectivity via external item ID This indicator ensures that an item
that already exists under an external item ID can be used.
General settings Unit 'piece' In the standard
system, this field contains a unit of measure for "piece". You can change this
unit. This unit is the base unit of measure (BOM header) or the component unit
of measure. Base unit of measure for:
Equipment BOM Functional location BOM Document structure Standard BOM Component
unit of measure for: Text item Document item Non-stock item without material
master record CAD active If you want to
maintain BOMs from a CAD system, set this indicator. This activates an
additional field in the BOM header and BOM item, which tells you whether the BOM
header or BOM item was maintained from a CAD system. If you deactivate
engineering change management, changes to bills of material are not recorded.
The modification parameters defined here apply to all BOM categories. The
following settings are made in the standard R/3 System: 1. Validity date
maintenance and engineering change management are active. 2. The current system
date is the default valid-from date. 3. CAD is active. 4. Explosion type for
BOM item: blank.
No Production and Planning Articles could be found as of now.
Share And Enjoy:These icons link to social bookmarking sites where readers can share and discover new web pages.
Keywords:
PP - Controlling data for your Bill of Materials, SAP Production Planning, SAP Production Planning, SAP Production Planning tutorial, SAP Production Planning tutorial pdf, history of SAP Production Planning, learn SAP Production Planning