Can we use same routing for materials undergoing the same process/operations? Can we avoid separate routing for each
Presume that there are 50 products and the fabrication shop uses a set of 10 machines. If all these products use the same
settings of the machines, Reference Operation Sets (task list type S) can be setup for common processes that use the
same work centers. However costing, scheduling and capacity will be affected if each product has different setup time and
Reference Operation sets can not be used.